DENVER R.O.W. PANEL REPLACEMENT

Right of Way Concrete Panel Replacement in City of Denver for Arco Murray
Right off busy I-25 our work along E Evans was not an easy task. Traffic control was setup flaggers directing this congested area. After area was prepared, inspected, and tested we poured over 35 CY of high early concrete with fiber-mesh to open this road back up as soon as possible. Once we placed cure and sawcut the joints accordingly, we installed backer rod and caulked sealant into the joints.